18th August
2010
Last week one of the two dormitory wings on the top floor was completed. The paint was still wet but the girls moved in. This wing is dedicated to Sam and Annita Cracchiolo. A big challenge remains to finish the sanitation block (toilets, showers and wash basins) which is critical because without proper sanitation Fr. Riwa can’t rescue more girls. 
Uncategorized